Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the molongui-authorship domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wordpress/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the premium-addons-for-elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wordpress/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tpebl domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wordpress/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wordpress/wp-includes/functions.php on line 6114
Fixed price agile software development - People10 Technologies, Inc.

People10 Technologies, Inc.

Fixed price agile software development

Fixed price contracts are often considered very harmful and many agile adopters say that we should simply avoid them. But most of the time they cannot be avoided, so we need to find ways to make them work for the goal we have, which is building valuable quality software. The only thing that actually bothers everyone in fixed price agile contracts is the scope. Scope in agile is equivalent to delivered ‘business value’ as opposed to WBS in traditional projects. The requirements are depicted as epics, features or stories depending on the level of granularity.

Measuring Scope in Agile

Scope in agile is measured as ‘Size Units’. There are many conventions to measure size; story point measurement is a popular method. Examples of size units are:

  • Story points
  • Feature points
  • Epic points etc.

For agile project management to be implemented in fixed price projects, three scenarios exist:

1)      Requirements are available and stable, so it is the most easiest agile fixed price project

Highlights:

Single contract with a single statement of work (SOW) Contract Type: fixed price

2)      Requirements are available partially, and there is a probability of requirements changing

Highlights:

One contract; Two SOWs Contract Type: Fixed price + fixed price

3)      Requirements are not at all available, so we have to look at innovative approach to structure the fixed price contracts

Highlights:

One contract; Two SOWs Contract Type: Time & Material with cap + fixed price

fixed price agile software development

Share

Share this post

Recent posts

Tags

Subscribe to our newsletter

    Reach out to us